In the past, whenever this Brazilian petrochemical plant had to remove corroded pipes from its reactors, a full 15-day factory shut-down was required. Today, with Powermax® plasma and FlushCut™ consumables it is possible to do the job without disrupting production.
Petrochemical plant
Read more

