Case studies

Prev ... ... Next Results 1 - 10 of 25

How a consumable avoided factory stops and generated savings for Petrochemical in Brazil

Case studies, Customer story, FlushCut consumables for Powermax systems

Posted on 06/22/2017

By Hypertherm

Fabrication shop improves productivity with new Freedom 38 PPA

Case studies, Customer story, Freedom 38 PPA engine-driven plasma system

Posted on 06/24/2016

By Hypertherm

Equipment leasing company offers more solutions with new Freedom 38 PPA

Case studies, Customer story, Construction, Equipment leasing, Freedom 38 PPA engine-driven plasma system, Gouging, Scrapping

Posted on 06/24/2016

By Hypertherm

Building a 1932 Ford pickup

Case studies, Customer story, Automotive, Powermax30 XP plasma system

Posted on 04/10/2016

By Hypertherm

Prev ... ... Next Results 1 - 10 of 25