Metal salvage
Metal sections are cut from the structure prior to building demolition. Welded-on pieces can be removed quickly by gouging off the weldsSystem: Powermax1250, 1650
Debris resizing and separating
Oversized metal is segmented to facilitate easier removal. Sections of the rebar are cut in order to separate large pieces of concrete.System: Powermax1000, 1250
Bulldozer track repair
Corroded steel bolts are cut off to remove the damaged shoes for the installation of new track.System: Powermax1250
Loader shovel repair
Welds securing wear plates, typically 1/8 to 1/2" (3 to 12 mm) thick, and damaged shovel teeth are gouged out to allow the installation of new parts.System: Powermax1000, 1250
Dump truck bed repair
Welds securing worn or damaged bed plates, typically 3/8 to 1/2" (10 to 12 mm) thick, are gouged out or the plates are cut for installation of new plate.System: Powermax1000, 1250